Steel plate pretreatment line mainly consists of inlet and outlet material conveying roller conveyor, shot blasting room, shot cleaning device, shot material circulation system, dust removal system, paint spraying system, drying room, paint mist treatment device and electric control system, and optional traverse loading and unloading device, rain and dirt cleaning device, sweeping code, spraying device and steel plate pre-heating device. Steel pretreatment line process refers to the processing of steel before processing (i.e. raw material state) for surface shot blasting and rust removal and coating with a layer of protective primer. Steel pretreatment can improve the corrosion resistance of mechanical products and metal components, improve the fatigue resistance of the steel plate and extend its service life; it can also optimize the steel surface process production state, which is conducive to CNC cutting machine undercutting and precision drop. In addition, steel plate pretreatment line can greatly improve the efficiency of steel plate surface cleaning, reduce labor intensity and pollution of the environment.
LONGFA™ ● Advantages Continuous blasting, efficient blast machine, stable conveying system, high safety ● Features Total Solution Use of excellent suppliers for all components Proven capabilities, excellent components, proven technology Customized - flexible layout Easy integration into existing manufacturing processes Wide range of equipment options ● Applications Removal of oxidation, rust, grease and other impurities Increase surface roughness, fatigue strength, and paint adhesion | ||
| ||
LONGFA™ Corrosion protection for steel products Pretreatment lines combine the pre-heating, blasting, painting and drying of workpieces (e.g. steel sheets, profiles) in one automatic line. | ||
「 Available options 」 ● Traverse loading and unloading device ● Electric heating device ● Flame heating device ● Rainwater cleaning device ● Sweeping device ● German original import shot blasting machine ● RTO ● Coding machine ● Monitoring System ● Highly automated control system | ||
「 Process flow 」 The workpiece is conveyed along the feeding roller conveyor, preheated, and arrives in the shot blasting room to start the shot blasting process. After shot blasting, the shot cleaning device will clean the steel shot on the surface of the steel plate, and then in the paint booth for primer spraying, and then in the drying room on the plate chain conveyor to be fully dried. Finally they will be sent out by the discharge conveyor roller. There they are either removed or sent out by a traverse down feeder. | ||
LONGFA™ ▍Common configurations of pre-processing lines Traverse loading device → feeding conveyor roller → rain cleaning device → pre-heating device → shot blasting treatment → shot circulation system → dust collector → paint spraying room → paint mist treatment → drying room → discharge conveyor roller → traverse loading device | ||
● Shot blasting systems The shot blasting system is the key in the pretreatment line. Steel plates are blasted to remove rust and oxidation. All machines are equipped with highly efficient blast machines that allow complete cleaning of the steel plate in the blast chamber, obtaining a surface roughness of approximately Rz30-75μm and a standard cleaning quality of Sa2.5. |
| |
LONGFA™ ▍Spraying system Due to the often long manufacturing or storage time between blasting and final coating, the workpiece is coated with a fast-drying temporary anti-corrosion primer in the spray booth during the spraying process (coating thickness of approximately 15-25 μm). Height, width and distance measurement system In front of the entrance of the shot blasting room, there is a pressure roller segmental width measurement device, photoelectric (laser) height measurement device. | ||
● Spraying technology The identified workpiece data (position, width, height, etc.) is transmitted to the painting system, thus controlling the accurate opening and closing of the spray gun during the painting process, avoiding the phenomenon of empty spraying and saving a lot of paint. | ||
LONGFA™ ▍Drying room and plate chain conveyor After painting, the steel plates are dried on a plate chain conveyor. The drying room uses a burner to generate heat, and then the hot air is continuously sent to the surface of the steel plate by a blower, so that even the paint with long drying time (such as water-based paint) can become dry quickly. | ||
● Inlet and outlet conveying roller conveyor The steel plates to be processed and treated are input and output here. | ||
「 Industry application 」 | ||||
"The selection of equipment mainly depends on the following factors" Workpiece dimensions and characteristics, productivity, operating parameters, | "Custom Solutions" Longfa specializes in custom-designed reinforcement and surface treatment solutions to provide solutions to your challenges. | "Standardized Equipment Solutions" Longfa specializes in custom-designed reinforcement and surface treatment solutions to provide solutions to your challenges. |
「Corporate image」
Add:Longfa Industrial Park, Xituan Town, Dafeng District, Yancheng City, Jiangsu Province, China
Mobile:18361116666 (Manager Jiang) / 15365656555
Tel: 0515-83752076 / 0515-83906666
Fax: 0515-83752808
Web address: http://www.longfablasting.com/
E-mail: 18361116666@163.com Postcode: 224125