Steel plate pretreatment line manufacturers to tell you, through the use of shot blasting machine how

2022-01-16

Steel plate pretreatment line manufacturers tell you how to use through the shot blasting machine
With the extensive use of shot blasting machine in various industries, the different models of shot blasting machine is also known to the general public, so, today, I will talk about how to use the pass-through shot blasting machine in the work process.
Through the design and manufacture of shot blasting machine absorbed a bit of similar products at home and abroad, the use of efficiency of the shot blasting machine and full nettle curtain type pill material separator, cleaning the workpiece using a high-strength nylon brush and high-pressure fan secondary cleaning device, preheating and drying parts using a variety of heating methods, spray painting department using high-pressure airless spraying method.
1, the operator must check the control cabinet (panel) before starting the machine whether the various types of switches in the required setting position (including the power switch) and then can start the machine. In order to avoid misoperation, damage to electrical and mechanical equipment, resulting in equipment accidents.
2, non-operators are not allowed to operate or touch the electrical switch control area, in order to avoid accidents.
3、Before the operation of the equipment, non-staff leave the equipment work area, in order to avoid accidents and injuries.
4、When the operator starts the machine, pay special attention to the indication of all kinds of instruments in the panel, and wait until the indication of each instrument reaches the normal value before operating the roller conveyor into the working procedure. If you find that the individual instrument indication has a large error (not normal) immediately shut down. Check the equipment fault handling before normal start-up work.
5、Operators must carry out daily maintenance and weekly maintenance (including lubrication) for this equipment according to "equipment management". Clean the dust collector in time every week
Dust and debris in the dust collector every week to avoid affecting the quality of dust removal and to ensure the integrity of the equipment.
7. During the operation of the equipment, the operator must inspect the equipment for abnormal sound and overheating of various parts. When the equipment is found to have serious faults during operation, press the "emergency stop" button to stop for repair, and cooperate with the professional staff to troubleshoot the equipment.
8, strictly conveying roller conveyor loading workpiece, in the blasting room round trip running type blasting. Only the roller conveyor workpiece through the blasting chamber body two ends after the round trip is allowed.
9, the end of the work, immediately cut off the machine power switch, so as not to make the equipment in operation, so as to avoid accidents with electrical appliances and equipment.

label

Recent browsing:

Related products

Relevant news

Jiangsu Longfa casting derusting equipment Co., Ltd

Add:Longfa Industrial Park, Xituan Town, Dafeng District, Yancheng City, Jiangsu Province, China

Mobile:18361116666 (Manager Jiang) / 15365656555

Tel: 0515-83752076 / 0515-83906666    

Fax: 0515-83752808

Web address: http://www.longfablasting.com/

E-mail: 18361116666@163.com           Postcode: 224125